Skip to main content

Special Scheme of Inspection Regulations 2025

Key Information

Regulations to make further provisions regarding the special scheme of inspection for steam boilers, pressure vessels, lifting equipment installed at the workplace and for matters connected therewith.


Source: AGC - P.U. (A) 25

PART I – PRELIMINARY

Regulation 1. Citation

Regulation 2. Interpretation


PART II – SPECIAL SCHEME OF INSPECTION

Regulation 3. Application for special scheme of inspection

Regulation 4. Requirements for special scheme of inspection of class A

Regulation 5. Requirements for special scheme of inspection of class B

Regulation 6. Additional information or documents

Regulation 7. Approval for special scheme of inspection

Regulation 8. Duration of special scheme of inspection

Regulation 9. Validity of certificate of fitness for plant requiring certificate of fitness under special scheme of inspection


PART III - DUTIES OF OCCUPIER

Regulation 10. Duties of occupier under special scheme of inspection of class A

Regulation 11. Duties of occupier under special scheme of inspection of class B


PART IV - SPECIAL INSPECTION

Regulation 12. Special inspection for plant requiring certificate of fitness

Regulation 13. Addition, reduction and change of information to list of plant requiring certificate of fitness under special scheme of inspection

Regulation 14. Verification inspection


PART V - REVOCATION AND TERMINATION OF SPECIAL SCHEME OF INSPECTION

Regulation 15. Revocation of special scheme of inspection

Regulation 16. Termination of special scheme of inspection

Regulation 17. Voluntary termination of special scheme of inspection


PART VI - GENERAL

Regulation 18. Changes in relation to plant requiring certificate of fitness under special scheme of inspection

Regulation 19. Non-refundable fee


SCHEDULES

FIRST SCHEDULE [Regulations 3 and 13 and subregulations 12(1), 14(2) and 14(3)] – FEES

(1) No.(2) Matter(3) Fees (RM)
Special Scheme of Class ASpecial Scheme of Class B
1.
Application for approval for a special scheme of inspection:
(a)
for the first plant requiring certificate of fitness
51,000
81,000
(b)
for every subsequent plant requiring certificate of fitness
1,000
1,000
2.
Application for special inspection for steam boiler:
(1)
Category 1
(a)
Heating surface less than 5 square metres
300
300
(b)
Heating surface of 5 square metres and above but less than 10 square metres
800
800
(c)
Heating surface of 10 square metres and above but less than 25 square metres
1,050
1,050
(d)
Heating surface of 25 square metres and above but less than 50 square metres
1,300
1,300
(e)
Heating surface of 50 square metres and above but less than 100 square metres
1,600
1,600
(f)
Heating surface of 100 square metres and above but less than 250 square metres
2,000
2,000
(g)
Heating surface of 250 square metres and above
2,400
2,400
(2)
Category 2 - Electric steam boiler, steam tube oven, steam tube hot plate, autoclaves or economiser
300
300
(3)
Category 3 - Superheater
300
300
3.
Application for special inspection for pressure vessel:
(1)
Capacity less than 0.1 cubic metres
140
140
(2)
Capacity of 0.1 cubic metres and above but less than 0.5 cubic metres
200
200
(3)
Capacity of 0.5 cubic metres and above but less than 5 cubic metres
300
300
(4)
Capacity of 5 cubic metres and above but less than 10 cubic metres
400
400
(5)
Capacity of 10 cubic metres and above but less than 15 cubic metres
550
550
(6)
Capacity of 15 cubic metres and above
700
700
4.
Application for special inspection for mobile crane
(1)
Safe working load less than 25,000 kilogrammes
-
550
(2)
Safe working load of 25,000 kilogrammes and above but less than 50,000 kilogrammes
-
700
(3)
Safe working load of 50,000 kilogrammes and above but less than 250,000 kilogrammes
-
850
(4)
Safe working load of 250,000 kilogrammes and above
-
1,000
5.
Application for special inspection for tower crane and quay crane
-
1,300
6.
Application for special inspection for other crane
(1)
Safe working load less than 3,000 kilogrammes
-
350
(2)
Safe working load of 3,000 kilogrammes and above but less than 5,000 kilogrammes
-
600
(3)
Safe working load of 5,000 kilogrammes and above but less than 10,000 kilogrammes
-
750
(4)
Safe working load of 10,000 kilogrammes and above but less than 20,000 kilogrammes
-
950
(5)
Safe working load of 20,000 kilogrammes and above
-
1,200
7.
Application for special inspection for hoist
(1)
Material hoist:
(a)
Safe working load less than 500 kilogrammes
-
350
(b)
Safe working load of 500 kilogrammes and above but less than 1,000 kilogrammes
-
600
(c)
Safe working load of 1,000 kilogrammes and above but less than 1,500 kilogrammes
-
750
(d)
Safe working load of 1,500 kilogrammes and above
-
1,000
(2)
Passenger hoist
-
1,000
8.
Special inspection for suspended access equipment
-
350
9.
Application for special inspection for launching gantry
-
2,000
10.
Application for special inspection for funicular railway
-
2,000
11.
Application for special inspection for aerial working platform
(1)
Power less than 15 kilowatt
-
350
(2)
Power of 15 kilowatt and above but less than 37 kilowatt
-
600
(3)
Power of 37 kilowatt and above but less than 75 kilowatt
-
750
(4)
Power of 75 kilowatt and above
-
950
12.
Application for special inspection for lift
(1)
Travel distance less than 12 metre
-
650
(2)
Travel distance of 12 metres and above but less than 30 metres
-
750
(3)
Travel distance of 30 metres and above but less than 80 metres
-
1,300
(4)
Travel distance of 80 metres and above but less than 140 metres
-
1,500
(5)
Travel distance of 140 metres and above but less than 300 metres
-
1,700
(6)
Travel distance of 300 metres and above
-
1,900
13.
Application for special inspection for escalator or walkalator
-
350
14.
Application for special inspection for other lifting machinery
(1)
Power less than 15 kilowatt
-
350
(2)
Power of 15 kilowatt and above but less than 37 kilowatt
-
600
(3)
Power of 37 kilowatt and above but less than 75 kilowatt
-
750
(4)
Power of 75 kilowatt and above
-
950
15.
Application for verification inspection
25,000
40,000
16.
Application to amend the list of plant requiring certificate of fitness of an approved special scheme of inspection:
(a)
for any addition to the list of plant requiring certificate of fitness
-
1,000
for every plant requiring certificate of fitness
(b)
for any reduction to the list of plant requiring certificate of fitness
-
-
(c)
for any change of information to the list of plant requiring certificate of fitness
-
-

SECOND SCHEDULE [Paragraphs 4(h) and 5(l)] – COMPLIANCE DECLARATION DOCUMENTS

THIRD SCHEDULE [Subregulation 7(2)] – DETAILS OF CERTIFICATE OF APPROVAL OF SPECIAL SCHEME OF INSPECTION

Set Font
Decrease Font SizeIncrease Font Size